Oyster Bay High School
150 East Main Street, Oyster Bay, NY |
| Client: |
Oyster Bay-East Norwich Sch. Distr. |
| Architect: |
BBS Architecture & Engineering |
| Size: |
9,000 s.f. |
| Cost: |
$3 million |
|
|
| Stalco served as general contractor for the ground-up expansion and renovation of the Oyster Bay High School complex. The project encompassed a 4,000-s.f., two-story addition, as well as renovations to 21,000 s.f. of the exterior and 5,000-s.f. of interiors in the pre-existing building. |
|
| Structural work included new foundations and the steel structure for the addition. The brick and ornamental pre-cast concrete façade of the new wing resembles the exterior of the original, historical building, erected in 1929. |
|
| The addition features an arched entrance with a custom FRP storefront, hallway, two science classrooms, and internal connections to the pre-existing structure. The new and renovated classrooms feature masonry walls, VCT tile flooring, and acoustical tile ceilings. |
|
| Stalco performed the renovations in an occupied school. To ensure student safety and prevent dust contamination, the firm erected a temporary sheetrock wall with one-way entrances around the construction areas. The entrances provided the fire egress for the school, but prevented access into the school through the construction zone. |
|
|
|